|
|
|
|
|
 |
Installation |
        |
| |
| In the case of DMF-Y-25, DMF-Y-40 the valve body and the connecting tube are screwed directly to the manifold box by screws. Green stock band of tetrafluoroethylene or sealing paste should be put between the threads for sealing purpose. The die-cast aluminium connecting tubes could be provided for easy assembly. |
|
| |
Sketch of DMF-Y-25 installation |
|
| |
  |
| |
Sketch of DMF-Y-40 installaton |
|
| |
  |
|
|